Opening of The Bob Stutz Path - Saturday 1/11/2014

On an overcast and slightly damp morning, The Bob Stutz Path was ceremoniously opened by Mayor Radford.

9028 Members of the Pathway Committee arrive early to set up the refreshments table under a tent - to protect the donut holes from inclement weather

 

9029 Coffee, fresh fruit, maps, and a viewe of Mt Hamilton

 

9031 The ribbon and scissors are ready for use near the sign at the entrance to the trail

 

9032 The trail heads up a slight hill before descending into a series of switchbacks into the valley where it branches into northbound and southbound legs

 

9033 View from the trail head looking over Highway 280 towards the south.

 

9041 Ann Duwe, chairman of the Pathway Committee, introduces Bob to the assembled crowd

 

9044 Mayor Radford is called in to cut the ribbon

 

9047

 

9052 Mayor John Radford and Bob Stutz will wield the scissors together

 

9056

 

9057 The deed is done

 

9058 Part of the assmbled crowd of well wishers

 

9063 Bob Stutz with family members

 

9067 Even Bob Stutz himself had to cope with a thick layer of clay adhered to the bottom of his boots

 

9070 The welcome rain shower had unfortunately made the trail unwelcome for the first bike riders on the trail

 

9072 Former Mayor Breene Kerr struggles to clear the accumulated clay from his tires